top of page

MMS Inspection & Rejection Station

Inspect the prepared workpiece and separate accepted and rejected parts. Connect the physical check to the PLC decision and downstream material flow.

RK-04-202

MMS Inspection & Rejection Station (RK-04-202)

Learning focus

  • Check. Hold the workpiece and execute the inspection movement.
  • Decide. Evaluate the result in the PLC and assign a process state.
  • Separate. Release an accepted part or operate the rejection mechanism.

Tailored to your requirements

We can adapt the equipment, control platform and learning tasks to your project. The final configuration is agreed with your technical team.

Request the product catalogue and detailed specification from Rhein Köster.

Plan your training laboratory.
Define the technical scope.

bottom of page